RfcAgiler  ScheduleSSL









       schedule_0      

       Clicking "Open" an instance will display the instance screen.
      schedule_1 

       Click the Schedule tab to go to the schedule.
      The schedule screen will be displayed.
       schedule_2
      The schedule is divided into an upper and lower section.
  The upper section is a schedule table for each user.
      The lower section shows the start, planned, and completion dates for each user, as well as the progress rate.

    (1) Top row
       a. User name:
         
A schedule is displayed for each user.
      b. ID:
       First is the user's ID (Ix: x is the owner number).
    Next is the L class (Ix-y: x is the owner number, y is the class sequential number).
        If there is an S class (Ix-y: x is the owner number, y is the class sequential number), it comes after that.
    There are two schedules for each ID.
       1) Top row: Start date to planned end date for each ID (blue)
       2) Bottom row: Completion date (work in progress (progress rate) is red, completed is black)

        schedule_3        

   (2) Bottom row
     a. User name:
         Displays the start date, expected completion date, and completion date for each user.
     b. L class name:
        Displays the L class of the instance.
     c. S class name:
         Displays the S class of the instance.
     d. Element name:
         Displays the element name of the L class or S class of the instance.
     e. Start date:
         Displays the start date of the user, L class, or S class.
     f. Scheduled completion date:
         Displays the scheduled completion date of the user, L class, or S class.
     g. Completion date:
          Displays the completion date of the user, L class, or S class.
     h. Progress rate:
          Displays the progress rate of the L class or S class.
          If completed, it is set to 100%.
     ID:
       User ID (Ix: x is the owner number)
             L class (Ix-y: x is the owner number, y is the class sequence number)
             S class (Ix-y: x is the owner number, y is the class sequence number)

 (3) Mouse over display 1 (default: when synchronizing the upper and lower rows)
      When the mouse is moved over the expected completion (blue) in the upper row:
      s_4 

      When you move the mouse over the working item (red) on the top row:
      s_5

      If you move the mouse over the top row of Completed (black):
      s_6

 (4) Mouse movement display 2 (to make the upper and lower rows unsynchronized)
      Move the mouse over Scheduled (blue), In progress (red), or Completed (black) in the upper row.
      Now double-click.
      s_8
     The date is displayed only in the upper row, and the lower row does not move (unsynchronized)
       s_9
      Only when you click the mouse will the lower row move and display the corresponding icon.
       s_10
       Move the mouse again in the upper row over Scheduled (blue), In progress (red), or Completed (black).
       Double-clicking will change the state to synchronized.
    *Double-clicking will switch between synchronous and asynchronous.
 

  (5) Move to instance by selecting the class in the lower section
     Select a class in the lower section and double-click it.
  Move to the instance and display the selected class.  
      s_12

       Go to the Instances screen.
      s_13